well the slab is done!!!! 4 inches deep with rebar and 8 inch footings! i dont even want to get started on this subject though! the guys barely speaked english and i specificaly told them and drew it out on paper that i wanted a 4 inch hole in the middle for a drain! and the concrete was supossed to have a pitch so it could drain after feedings! i dont know wat to do now, i can cut a hole but it will be useless because the slab isnt sloped!!
so amber dog u think i should get a door that swings into the room???
time 4 plan u think i should get one that swings outwards so i can use up the space in the room, i have to find those hinges i went to home depot and all the outward doors have the hinges on the outside, ill be looking again today ill go to lowes and see wat they have
walls are built and ready to be stood up! i need to get my roof package tomorrow and the roof will be on! and then ill have to call my buddy to help me with the electrical! i dont plan on haveing a extension cord running out there, i will put a big pole up in the backyard and i guess run cable from the main house to the backyard so i can wire up some outlets, if not that ill have to dig and put it under ground which means a lot more work! pics will be up later